GBQ Factory ·
Period: Jan – Apr 2026 (4 months)
Annual budget & plan: Full year 2026
Linear pace at 4/12: 33.33%
A · Executive KPI Snapshot
YTD Sales (Actual)
15.70 M
▲ +17.42% vs YTD budget
Annual Budget Achv
36.14%
+2.81 pp ahead of pace
YTD Cycles Actual
390,067
▲ +13.39% vs plan 344,000
YTD OEE
68.09%
▲ +4.09 pp vs target 64.0%
YTD Blocks
7.38 M
▲ +10.62% vs plan 6.67 M
YTD Waste
0.067%
≈ 7 pcs per 1,000 blocks
Sales / Cycle
40.26 SAR
Revenue productivity
Sales / Block
2.24 SAR
Per normalized block
Avg Cycle Time
17.13 s
+0.13 s vs 17.0 s target
Downtime YTD
652.9 h
22.7% of full time 2,880 h
FG Stock Coverage
30.1%
▼ All 8 SKUs below 7-d safety
Raw Material Stock
60.2%
2 materials Critical
B · Annual Performance Overview — YTD Progress vs Full-Year 2026 Targets
Sales (SAR) — Annual Budget
36.14% of 43,458,052
+2.81 pp ahead of linear pace (33.33%)
YTD 15,704,895Remaining 27,753,157
Pace required for the remaining 8 months: 3.47 M / month · YTD avg 3.93 M / month
Cycles — Annual Plan
35.02% of 1,114,000
+1.69 pp ahead of linear pace
YTD 390,067Remaining 723,933
Pace required for remaining 8 months: 90,492 / month · YTD avg 97,517 / month
Blocks (pcs) — Annual Plan
34.13% of 21,627,000
+0.80 pp ahead of linear pace
YTD 7,380,711Remaining 14,246,289
Pace required for remaining 8 months: 1.78 M / month · YTD avg 1.85 M / month
C · Sales Monthly Detail (Actual vs Budget)
January
4.59 M
116.1%
Budget 3.95 M · +0.64 M
February
3.78 M
135.1%
Budget 2.80 M · +0.98 M
March
2.70 M
96.4%
Budget 2.80 M · −0.10 M
April
4.64 M
121.2%
Budget 3.83 M · +0.81 M
GBQ — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – Apr 2026
| Month | Budget (SAR) | Actual (SAR) | Variance | Achv % |
| January | 3,952,788 | 4,591,118 | +638,330 | 116.1% |
| February | 2,797,334 | 3,780,149 | +982,816 | 135.1% |
| March | 2,798,251 | 2,696,643 | −101,608 | 96.4% |
| April | 3,826,146 | 4,636,985 | +810,839 | 121.2% |
| YTD Total (Jan–Apr) | 13,374,519 | 15,704,895 | +2,330,376 | 117.4% |
| Annual 2026 Budget | 43,458,052 | YTD = 36.14% | Remaining 27,753,157 | 8 months left |
D · Production Cycles — Monthly Plan vs Actual
Monthly Cycles (thousands) · Δ% shown above each month
Jan – Apr 2026 · YTD Plan 344k / Actual 390k = 113.4%
| Month | Plan | Actual | EUP | Variance | Δ% |
| January | 102,000 | 109,019 | 134,274 | +7,019 | +6.88% |
| February | 72,000 | 104,765 | 124,331 | +32,765 | +45.51% |
| March | 72,000 | 73,979 | 86,431 | +1,979 | +2.75% |
| April | 98,000 | 102,304 | 123,907 | +4,304 | +4.39% |
| YTD Total | 344,000 | 390,067 | 468,943 | +46,067 | +13.39% |
| Annual 2026 Plan | 1,114,000 | YTD = 35.02% | Remaining 723,933 | at 4/12 = 33.33% |
E · OEE Components — Availability × Performance × Quality
Availability (%)
Run time ÷ Full time · YTD 77.62%
Performance (%)
Std cycle time ÷ Actual · YTD 87.57%
Quality (%)
1 − Waste % · YTD 99.99% (file value)
OEE Monthly Roll-up = A × P × Q
Decomposition of the headline OEE figure
| Month | Availability | Performance | Quality | OEE | vs Target 64.0% |
| January | 84.38% | 89.12% | 99.99% | 75.19% | +11.19 pp |
| February | 87.57% | 88.03% | 99.99% | 77.08% | +13.08 pp |
| March | 56.43% | 85.78% | 99.99% | 48.40% | −15.60 pp |
| April | 82.08% | 87.36% | 99.99% | 71.70% | +7.70 pp |
| YTD | 77.62% | 87.57% | 99.99% | 68.09% | +4.09 pp |
F · Downtime Analysis — Reason Pareto & Planned vs Unplanned
YTD Downtime by Reason — Pareto
Hours bars + Cumulative % · Total 652.9 h
Planned vs Unplanned Downtime
YTD breakdown with hours and percentages
Planned P
567.9 h
87.0% of total
Cleaning 257h · PM 189h · Off 122h
Unplanned U
85.0 h
13.0% of total
Breakdown 65h · Other 15h · Adj 4h · Forklift 1h · Quality 0.2h
G · Production Mix by SKU (YTD)
YTD Product Mix
390,067 cycles · 7,380,711 blocks · Donut shows % shares
| SKU | Cycles | Blocks | Cycle Share | Block Share |
| HB 20×20 | 255,983 | 4,607,694 | 65.62% | 62.43% |
| Thermo 7.5 white | 44,881 | 807,858 | 11.51% | 10.95% |
| HB 20×15 | 42,113 | 1,010,712 | 10.79% | 13.69% |
| HB 20×30 | 18,068 | 216,816 | 4.63% | 2.94% |
| HB 20×10 | 17,563 | 579,579 | 4.50% | 7.85% |
| Thermo 30 white | 8,035 | 96,420 | 2.06% | 1.31% |
| Thermo 7.5 blue | 3,178 | 57,204 | 0.81% | 0.78% |
| Thermo Jaffali | 246 | 4,428 | 0.06% | 0.06% |
| Total | 390,067 | 7,380,711 | 100.0% | 100.0% |
H · Raw Material Consumption & Inventory
YTD Raw Material Consumption
Total kg · kg / cycle · % of total mix
| Material | YTD kg | kg / cycle | % total |
| N.silica | 46,112,512 | 118.22 | 31.0% |
| Aggregate 4.75 mm | 32,245,082 | 82.67 | 21.7% |
| Aggregate 9.5 mm | 27,690,043 | 70.99 | 18.6% |
| C.sand | 20,468,501 | 52.47 | 13.8% |
| Water | 11,395,965 | 29.22 | 7.7% |
| Cement | 10,703,920 | 27.44 | 7.2% |
| Total | 148,616,023 | 381.00 | 100.0% |
Finished Goods Inventory — 01 May 2026
Actual vs 7-day safety stock
| SKU | Actual | Safety (7-d) | % | Risk |
| Block 10 | 17,600 | 49,500 | 35.6% | Critical |
| Block 15 | 26,997 | 48,000 | 56.2% | Watch |
| Block 20 | 70,358 | 270,000 | 26.1% | Critical |
| Block 30 | 3,913 | 9,000 | 43.5% | Critical |
| Thermo 30 white | 1,134 | 6,000 | 18.9% | Critical |
| Thermo 7.5 white | 18,826 | 72,000 | 26.1% | Critical |
| Thermo Jaffali | 77 | 3,000 | 2.6% | Critical |
| Thermo EPS 30 | 1 | 4,500 | 0.0% | Critical |
| Total | 138,906 | 462,000 | 30.1% | Critical |
Raw Material Inventory — 01 May 2026
Actual (kg) vs 3-day safety stock
| Material | Actual (kg) | Safety stock (3-d) | % | Risk |
| Cement | 161,400 | 300,000 | 53.8% | Watch |
| N.silica | 965,578 | 1,500,000 | 64.4% | Watch |
| Aggregate 9.5 mm | 998,309 | 900,000 | 110.9% | OK |
| Aggregate 4.75 mm | 360,521 | 1,050,000 | 34.3% | Critical |
| C.sand | 194,379 | 700,000 | 27.8% | Critical |
| Total | 2,680,187 | 4,450,000 | 60.2% | — |
I · Executive Insights & Recommended Actions
1
Sales YTD beat budget by +17.4% (+2.33 M SAR)
YTD actual 15.70 M vs YTD budget 13.37 M. Feb (+35.1%) and Apr (+21.2%) drove over-performance. On track for annual 43.46 M.
2
Annual budget 36.1% achieved at 4/12 of year
+2.81 pp ahead of linear pace (33.33%). Remaining 27.75 M over 8 months = 3.47 M/month required vs YTD avg 3.93 M/month — comfortable margin.
3
Production cycles +13.4% vs YTD plan
390,067 actual vs 344,000 planned (Jan–Apr). Blocks +10.6% vs plan. Operationally over-delivering on volume.
4
March OEE collapsed to 48.4% — Availability driver
A 56.4% (vs YTD 77.6%) was the single driver. Performance 85.8% and Quality 99.99% held steady. Idle 324 h (122 h Off + 127 h PM).
5
87% of downtime is Planned
567.9 h planned vs only 85.0 h unplanned. Cleaning (257 h) + PM (189 h) + Off (122 h) — Cleaning is the largest single bucket and the best process-redesign target.
6
FG stock 30.1% of 7-day safety — all 8 SKUs critical
Production beat plan but FG inventory depleted faster than the plan compensates. Supply chain mismatch: revenue strong but service level at risk.
7
Two raw materials below 3-day safety
Aggregate 4.75 mm (34.3%) and C.sand (27.8%) — RM-driven stoppage risk.
8
Waste improved March → April
Waste dropped from 9 pcs/1,000 (Mar) to 7 pcs/1,000 (Apr). Quality discipline working — March spike is recoverable.
GRM Factory ·
Period: Jan – Apr 2026 (4 months)
Annual budget & plan: Full year 2026
Linear pace at 4/12: 33.33%
A · Executive KPI Snapshot
YTD Sales (Actual)
13.81 M
▲ +9.09% vs YTD budget
Annual Budget Achv
33.34%
≈ on pace (33.33%)
YTD Cycles Actual
346,338
▼ −6.50% vs plan 370,410
YTD OEE
58.32%
▼ −7.42 pp vs target 65.74%
YTD Blocks
5.69 M
▲ +26.57% vs plan 4.50 M
YTD Waste
0.125%
▲ 16.7% better than target
Sales / Cycle
39.88 SAR
Close to GBQ
Sales / Block
2.22 SAR
Per normalized block
Avg Cycle Time
17.90 s
+0.30 s vs 17.6 s target
Downtime YTD
1,134.5 h
41.3% of full time 2,748 h
FG Stock Coverage
N/A
Data not in source file
Raw Material Stock
N/A
Data not in source file
B · Annual Performance Overview — YTD Progress vs Full-Year 2026 Targets
Sales (SAR) — Annual Budget
33.34% of 41,426,546
≈ on linear pace (33.33%)
YTD 13,811,928Remaining 27,614,618
Pace required for remaining 8 months: 3.45 M / month · YTD avg 3.45 M / month
Cycles — Annual Plan
29.40% of 1,177,910
−3.93 pp behind linear pace
YTD 346,338Remaining 831,572
Pace required for remaining 8 months: 103,947 / month · YTD avg 86,585 / month · needs +20%
Blocks (pcs) — Annual Plan
40.31% of 14,123,820
+6.98 pp ahead of linear pace
YTD 5,693,238Remaining 8,430,582
Pace required for remaining 8 months: 1.05 M / month · YTD avg 1.42 M / month · strong buffer
C · Sales Monthly Detail (Actual vs Budget)
January
3.67 M
97.7%
Budget 3.75 M · −0.08 M
February
2.86 M
116.5%
Budget 2.46 M · +0.41 M
March
2.81 M
103.9%
Budget 2.71 M · +0.10 M
April
4.47 M
119.3%
Budget 3.74 M · +0.72 M
GRM — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – Apr 2026
| Month | Budget (SAR) | Actual (SAR) | Variance | Achv % |
| January | 3,752,285 | 3,667,445 | −84,840 | 97.7% |
| February | 2,455,540 | 2,861,349 | +405,809 | 116.5% |
| March | 2,709,934 | 2,814,883 | +104,950 | 103.9% |
| April | 3,743,795 | 4,468,251 | +724,457 | 119.3% |
| YTD Total (Jan–Apr) | 12,661,554 | 13,811,928 | +1,150,374 | 109.1% |
| Annual 2026 Budget | 41,426,546 | YTD = 33.34% | Remaining 27,614,618 | 8 months left |
D · Production Cycles — Monthly Plan vs Actual
Monthly Cycles (thousands) · Δ% shown above each month
Jan – Apr 2026 · YTD Plan 370k / Actual 346k = 93.5%
| Month | Plan | Actual | EUP | Variance | Δ% |
| January | 105,000 | 81,633 | 82,764 | −23,367 | −22.25% |
| February | 85,000 | 81,397 | 92,274 | −3,603 | −4.24% |
| March | 76,410 | 83,510 | 91,722 | +7,100 | +9.29% |
| April | 104,000 | 99,798 | 108,069 | −4,202 | −4.04% |
| YTD Total | 370,410 | 346,338 | 374,829 | −24,072 | −6.50% |
| Annual 2026 Plan | 1,177,910 | YTD = 29.40% | Remaining 831,572 | behind pace |
E · OEE Components — Availability × Performance × Quality
Availability (%)
YTD 68.05% · Range 56.0 – 75.5%
Performance (%)
YTD 86.08% · Range 68.4 – 99.0%
Quality (%)
YTD 99.88% · Range 99.85 – 99.90%
OEE Monthly Roll-up = A × P × Q
Decomposition of the headline OEE figure
| Month | Availability | Performance | Quality | OEE | vs Target 65.74% |
| January | 56.05% | 95.30% | 99.90% | 53.30% | −12.44 pp |
| February | 66.82% | 98.95% | 99.85% | 66.00% | +0.26 pp |
| March | 75.49% | 68.40% | 99.90% | 51.60% | −14.14 pp |
| April | 75.28% | 83.40% | 99.85% | 62.70% | −3.04 pp |
| YTD | 68.05% | 86.08% | 99.88% | 58.32% | −7.42 pp |
F · Downtime Analysis — Reason Pareto & Planned vs Unplanned
YTD Downtime by Reason — Pareto
Hours bars + Cumulative % · Total 1,134.5 h
Planned vs Unplanned Downtime
YTD breakdown with hours and percentages
Planned P
790.5 h
69.7% of total
Setup & PM 646h · Planned Stop 144.5h
Unplanned U
344 h
30.3% of total
Single bucket "Unplanned Stop" in source
G · Production Mix — Category & SKU (YTD)
YTD Product Mix by Cycles
346,338 cycles · Three categories (Blocks 84% / Interlock 14% / Curbstone 2%)
| Category / SKU | Cycles | Share |
| Blocks | 291,616 | 84.20% |
| — HB 20×20 | 213,519 | 61.65% |
| — American Block 20 | 31,154 | 8.99% |
| — HB 20×15 | 30,327 | 8.76% |
| — Thermo Block | 10,678 | 3.08% |
| — HB 20×10 | 5,938 | 1.71% |
| Interlock | 48,631 | 14.04% |
| Curbstone | 6,091 | 1.76% |
| Total | 346,338 | 100.0% |
H · Paver Output (GRM-specific)
Paver Output — Plan vs Actual (m²)
YTD Plan 237,027 m² vs Actual 93,413 m² = −60.6%
Single largest production underperformance in either factory's file — review capacity allocation between blocks and pavers.
I · Executive Insights & Recommended Actions
1
Sales YTD beat budget by +9.1% (+1.15 M SAR)
YTD actual 13.81 M vs YTD budget 12.66 M. Apr (+19.3%) and Feb (+16.5%) drove over-performance. On track for annual 41.43 M.
2
Annual budget exactly on pace (33.34%)
At 4/12 of year (linear pace 33.33%) — GRM has very little buffer. Remaining 27.61 M requires 3.45 M/month vs YTD avg 3.45 M — exactly on pace.
3
YTD cycles −6.5% vs plan — −3.9 pp behind annual pace
346,338 actual vs 370,410 planned. Annual achievement 29.4% vs 33.3% linear. Jan (−22.3%) was the gap driver; Mar over-performed (+9.3%).
4
March OEE shock 51.6% — Performance driver
P fell to 68.4% (vs YTD 86.1%). A 75.5% was actually highest of YTD. Different cause vs GBQ March shock (which was A-driven).
5
Paver output −60.6% vs YTD plan
237,027 m² planned vs 93,413 m² actual. Mix shifted from pavers to blocks — but pavers have higher SAR/m².
6
70% of downtime is Planned (Setup & PM)
646 h Setup & PM + 144 h Planned Stop = 790 h planned (69.7%). PM cadence volatile: 135 h (Jan) → 252 h (Mar).
7
Waste 16.7% better than target
YTD 0.125% vs 0.15% target. Quality discipline is positive.
8
Blocks +26.6% vs plan, +40.3% of annual
5.69 M actual vs 4.50 M planned. Annual block target already 40% achieved — strong buffer if mix sustained.
9
SAR / block essentially in line with GBQ (cycles × 18 basis)
GRM 2.22 SAR/block vs GBQ 2.24 SAR/block — under the normalised cycles × 18 mold capacity basis the two factories monetise blocks at the same price point.
Group (GBQ + GRM) ·
Period: Jan – Apr 2026 (4 months)
Annual budget & plan: Full year 2026
Linear pace at 4/12: 33.33%
A · Consolidated Group KPIs
Group YTD Sales
29.52 M
▲ +13.37% vs YTD budget
Annual Budget (2026)
84.88 M
YTD = 34.77% of annual
Group Cycles
736,405
▲ +3.08% vs plan 714,410
Group OEE
63.20%
▼ −1.54 pp vs target avg
Group Blocks
13.07 M
▲ +17.04% vs plan 11.17 M
Group Downtime
1,787 h
31.8% of full time
GBQ Sales Share
53.2%
15.70 M of 29.52 M
GRM Sales Share
46.8%
13.81 M of 29.52 M
Group Sales / Cycle
40.08 SAR
Jan–Apr basis
Better OEE
GBQ
68.09% vs GRM 58.32%
Better SAR / Block
GBQ
GBQ 2.24 vs GRM 2.22
Group Quality
99.93%
YTD avg both factories
B · Annual Performance Overview — Group YTD vs 2026 Targets
Sales (SAR) — Annual Budget
34.77% of 84,884,597
+1.44 pp ahead of linear pace
YTD 29,516,823Remaining 55,367,774
Pace required for remaining 8 months: 6.92 M / month · YTD avg 7.38 M / month
Cycles — Annual Plan
32.13% of 2,291,910
−1.20 pp behind linear pace
YTD 736,405Remaining 1,555,505
Pace required for remaining 8 months: 194,438 / month · YTD avg 184,101 / month · +5.6% lift required
Blocks (pcs) — Annual Plan
36.57% of 35,750,820
+3.24 pp ahead of linear pace
YTD 13,073,949Remaining 22,676,871
Pace required for remaining 8 months: 2.83 M / month · YTD avg 3.27 M / month · comfortable buffer
C · Group Sales Monthly Detail (Actual vs Budget)
January
8.26 M
107.2%
Budget 7.71 M · +0.55 M
February
6.64 M
126.4%
Budget 5.25 M · +1.39 M
March
5.51 M
100.1%
Budget 5.51 M · ±0.00 M
April
9.11 M
120.3%
Budget 7.57 M · +1.54 M
Group — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – Apr 2026
| Month | Budget (SAR) | Actual (SAR) | Variance | Achv % |
| January | 7,705,073 | 8,258,563 | +553,490 | 107.2% |
| February | 5,252,874 | 6,641,498 | +1,388,624 | 126.4% |
| March | 5,508,184 | 5,511,526 | +3,342 | 100.1% |
| April | 7,569,940 | 9,105,236 | +1,535,296 | 120.3% |
| YTD Total (Jan–Apr) | 26,036,073 | 29,516,823 | +3,480,750 | 113.4% |
| Annual 2026 Budget | 84,884,597 | YTD = 34.77% | Remaining 55,367,774 | 8 months left |
D · Group Production Cycles — Monthly Plan vs Actual
Monthly Cycles (thousands) · Δ% shown above each month
Jan – Apr 2026 · YTD Plan 714k / Actual 736k = 103.1%
| Month | Plan | Actual | EUP | Variance | Δ% |
| January | 207,000 | 190,652 | 217,038 | −16,348 | −7.90% |
| February | 157,000 | 186,162 | 216,605 | +29,162 | +18.57% |
| March | 148,410 | 157,489 | 178,153 | +9,079 | +6.12% |
| April | 202,000 | 202,102 | 231,977 | +102 | +0.05% |
| YTD Total | 714,410 | 736,405 | 843,772 | +21,995 | +3.08% |
| Annual 2026 Plan | 2,291,910 | YTD = 32.13% | Remaining 1,555,505 | behind pace by 1.20 pp |
E · Group OEE Components — Availability × Performance × Quality (weighted)
Availability (%)
Weighted by full time · YTD 72.95%
Performance (%)
Weighted by run time · YTD 86.89%
Quality (%)
Average of two factories · YTD 99.93%
Group OEE Monthly Roll-up = A × P × Q
GBQ & GRM combined
| Month | Availability | Performance | Quality | Group OEE | GBQ / GRM OEE |
| January | 70.22% | 91.59% | 99.95% | 64.28% | 75.19 / 53.30 |
| February | 77.20% | 92.76% | 99.92% | 71.55% | 77.08 / 66.00 |
| March | 65.04% | 76.66% | 99.95% | 49.84% | 48.40 / 51.60 |
| April | 78.68% | 85.46% | 99.92% | 67.18% | 71.70 / 62.70 |
| YTD (weighted) | 72.95% | 86.89% | 99.93% | 63.32% | 68.09 / 58.32 |
F · Group Downtime Analysis — Reason Pareto & Planned vs Unplanned
YTD Downtime by Reason — Pareto (Group)
Hours bars + Cumulative % · Total 1,787 h (GBQ + GRM)
Planned vs Unplanned Downtime (Group)
YTD breakdown with hours and percentages
Planned P
1,358 h
76.0% of total
Setup & PM 646h · Cleaning 257h · GBQ PM 189h · Planned Stop 144h · Off 122h
Unplanned U
429 h
24.0% of total
GRM Unplanned Stop 344h · GBQ Breakdown 65h · Other 20h
G · Group Production Mix (YTD combined)
YTD Group Product Mix by Cycles
736,405 total cycles · GBQ + GRM consolidated SKUs
| SKU / Category | Cycles | Share | From GBQ | From GRM |
| HB 20×20 | 469,502 | 63.75% | 255,983 | 213,519 |
| HB 20×15 | 72,440 | 9.84% | 42,113 | 30,327 |
| Thermo (all variants) | 67,018 | 9.10% | 56,340 | 10,678 |
| Interlock (GRM only) | 48,631 | 6.60% | — | 48,631 |
| American Block (GRM only) | 31,154 | 4.23% | — | 31,154 |
| HB 20×10 | 23,501 | 3.19% | 17,563 | 5,938 |
| HB 20×30 (GBQ only) | 18,068 | 2.45% | 18,068 | — |
| Curbstone (GRM only) | 6,091 | 0.83% | — | 6,091 |
| Total | 736,405 | 100.0% | 390,067 | 346,338 |
H · Cycles by Factory & OEE Trend by Factory
Monthly Cycles by Factory — Stacked
in thousands · Numbers shown inside each segment
OEE Trend by Factory
Monthly OEE % with numbers labeled
I · GBQ vs GRM — Side-by-Side Comparison
| Metric | GBQ | GRM | Group | Leader |
| Sales — YTD Actual (SAR) | 15,704,895 | 13,811,928 | 29,516,823 | GBQ |
| Sales — YTD Budget (SAR) | 13,374,519 | 12,661,554 | 26,036,073 | — |
| Sales — YTD Variance (SAR) | +2,330,376 | +1,150,374 | +3,480,750 | GBQ |
| Sales — YTD Achievement % | 117.4% | 109.1% | 113.4% | GBQ |
| Sales — Annual Budget (SAR) | 43,458,052 | 41,426,546 | 84,884,597 | — |
| Sales — Annual % achieved | 36.14% | 33.34% | 34.77% | GBQ |
| Sales / cycle | 40.26 SAR | 39.88 SAR | 40.08 SAR | GBQ |
| Sales / block (cycles × 18) | 2.24 SAR | 2.22 SAR | 2.23 SAR | GBQ |
| Plan cycles | 344,000 | 370,410 | 714,410 | GRM |
| Actual cycles | 390,067 | 346,338 | 736,405 | GBQ |
| Plan achievement % | 113.39% | 93.50% | 103.08% | GBQ |
| Annual cycles target | 1,114,000 | 1,177,910 | 2,291,910 | — |
| Annual cycles % achieved | 35.02% | 29.40% | 32.13% | GBQ |
| OEE % | 68.09% | 58.32% | 63.20% | GBQ |
| Availability % | 77.62% | 68.05% | 72.97% | GBQ |
| Performance % | 87.57% | 86.08% | 86.86% | GBQ |
| Quality % | 99.99% | 99.875% | 99.93% | GBQ |
| Avg cycle time (s) | 17.13 | 17.90 | 17.47 | GBQ |
| Blocks (M pcs) | 7.38 | 5.69 | 13.07 | GBQ |
| Annual blocks % achieved | 34.13% | 40.31% | 36.57% | GRM |
| Waste % | 0.067% | 0.125% | 0.094% | GBQ |
| Run / Idle time (h) | 2,227 / 653 | 1,870 / 1,134 | 4,097 / 1,787 | GBQ |
| Planned / Unplanned downtime (h) | 568 / 85 | 790 / 344 | 1,358 / 429 | GBQ |